Noun: Engineering Change Order

An EngineeringChangeOrder can be used to request a change to an manufactured item. This document allows the Change to progress through the different states from being a request and going through the review process to becoming an approved EngineeringChangeOrder.

Child Components

Type Code 0..1
Action Code 0..1
Engineering Change Header 0..1
Engineering Change Detail 0..∞

Scenarios in which Engineering Change Order is used

Feedback

OAGi and its members welcome your feedback.

UUID: 4cb2003484bb4c249e3f4057c892097e

OAGIS Version 10.13.2