Report Time Period
Is the time period that the report covers.
Child Components
Type Code 0..1
Inclusive Indicator 0..1
Name 0..1
Year 0..∞
Month 0..∞
Start Date Time 0..1
Start Time 0..1
Duration 0..1
End Date Time 0..1
End Time 0..1
UML Class Model
The following link opens the SVG image in a separate browser tab.
You can save the file locally and use it, for example, in PowerPoint.
SVG File
You can save the file locally and use it, for example, in PowerPoint.
SVG File
@startuml
class ReportTimePeriod {
String TypeCode
String InclusiveIndicator
String Name
String Year
String Month
String StartDateTime
String StartTime
String Duration
String EndDateTime
String EndTime
}
hide circle
@enduml
Where Used
Following is a list of components that have Report Time Period as a child component.
- Move From Operation
- Move To Operation
- Operation
- Production Performance
- Production Request
- Production Response
- Production Schedule
Feedback
OAGi and its members welcome your feedback.
UUID: 30b477902c5d43048cb5fad42dcfa333
connectSpec (OAGIS) Version 10.12