Resource Allocation
Specifies details for dividing and assigning expenses and income from a Resource
Child Components
Type Code 0..1
Action Code 0..1
Identifier 0..∞
UUID 0..1
Source Identifier 0..1
Party Identifier 0..1
Identifier Set 0..∞
Related Identifier 0..∞
Resource 0..∞
Unit Cost 0..1
Required Quantity 0..1
Quantity 0..∞
Required Duration 0..1
Total Cost Amount 0..1
Description 0..∞
Note 0..∞
Extension 1..1
UML Class Model
The following link opens the SVG image in a separate browser tab.
You can save the file locally and use it, for example, in PowerPoint.
SVG File
You can save the file locally and use it, for example, in PowerPoint.
SVG File
@startuml
class ResourceAllocation {
String TypeCode
CodeList ActionCode
String Identifier
String UUID
String SourceIdentifier
String PartyIdentifier
String RequiredQuantity
String Quantity
String RequiredDuration
String TotalCostAmount
String Description
String Note
}
class "IdentifierSet"{}
class "RelatedIdentifier"{}
class "Resource"{}
class "UnitCost"{}
ResourceAllocation o-d- "0...∞" "IdentifierSet"
ResourceAllocation o-r- "0...∞" "RelatedIdentifier"
ResourceAllocation o-u- "0...∞" "Resource"
ResourceAllocation o-l- "0...1" "UnitCost"
hide circle
@enduml
Where Used
Following is a list of components that have Resource Allocation as a child component.
- Allocate Resources
- Engineering Change Revised Route Operation
- Estimated Allocate Resources
- Operation Reference
- Previous Operation
- Production Order Route Operation
- Route Operation
- Work Order Line
- Work Order Sub Line
Feedback
OAGi and its members welcome your feedback.
UUID: a493e61a110d4a39b87fcbcc9521797c
connectSpec (OAGIS) Version 10.12