Supplier Selection Time Period
Is the TimePeriod that Supplier(s) will be selected
Child Components
Type Code 0..1
Inclusive Indicator 0..1
Name 0..1
Year 0..∞
Month 0..∞
Start Date Time 0..1
Start Time 0..1
Duration 0..1
End Date Time 0..1
End Time 0..1
UML Class Model
The following link opens the SVG image in a separate browser tab.
You can save the file locally and use it, for example, in PowerPoint.
SVG File
You can save the file locally and use it, for example, in PowerPoint.
SVG File
@startuml
class SupplierSelectionTimePeriod {
String TypeCode
String InclusiveIndicator
String Name
String Year
String Month
String StartDateTime
String StartTime
String Duration
String EndDateTime
String EndTime
}
hide circle
@enduml
Where Used
Following is a list of components that have Supplier Selection Time Period as a child component.
Feedback
OAGi and its members welcome your feedback.
UUID: 397e826923f648c0bb1b60310cd5472e
connectSpec (OAGIS) Version 10.12