BOD: Change Allocate Resource
The purpose of the ChangeAllocateResource is to notify a Manufacturing Application of the use of required labor or machine time on a production order making a product. The business environments most likely to require this capability are any type of manufacturing scenario.
This BOD communicates what machine was utilized or which person performed the work and their labor skill class, along with the amount of time worked and at what time this event occurred.
Child Components
Release Identifier 1..1
Version Identifier 0..1
System Environment Code 0..1
Language Code 0..1
Application Area 1..1
Data Area 1..1
Change 1..1
Allocate Resource 1..∞
Scenarios in which Change Allocate Resource is used
Feedback
OAGi and its members welcome your feedback.
UUID: 48944b937afc4af4aa4b18e16c31793f
OAGIS Version 10.12