BOD: Cancel Acknowledge Engineering Change Order
The purpose of the CancelAcknowledgeEngineeringChangeOrder to communicate to a business application module or system that the synchronization of a specified engineering change document has been completed successfully.
This BOD may be necessary to address the Make to Order, Assemble to Order, or Mixed Mode business ordering scenarios in a Order Management to Manufacturing application integration scenario.
There are many possible business applications in several environments that may use this capability. For example, a PDM, MRP, Inventory, or Manufacturing business application could use this to communicate the requirement to Synchronize a Engineering Change Document.
Child Components
Release Identifier 1..1
Version Identifier 0..1
System Environment Code 0..1
Language Code 0..1
Application Area 1..1
Data Area 1..1
Cancel Acknowledge 1..1
Engineering Change Order 1..∞
Scenarios in which Cancel Acknowledge Engineering Change Order is used
Feedback
OAGi and its members welcome your feedback.
UUID: ef6e2f69864746c397de51b7463125cb
OAGIS Version 10.13.2