BOD: Get Engineering Change Order
The purpose of the Get EngineeringChangeOrder is to communicate to a business application module or system the need to request a Show EngineeringChangeOrder for the Engineering Change Document specified in the Message.
This BOD may be necessary to address the Make to Order, Assemble to Order, or Mixed Mode business ordering scenarios in a Order Management to Manufacturing application integration scenario.
There are many possible business applications in several environments that may use this capability. For example, a PDM, MRP, Inventory, or Manufacturing business application could use this to communicate the requirement to request an Engineering Change Document.
Child Components
Release Identifier 1..1
Version Identifier 0..1
System Environment Code 0..1
Language Code 0..1
Application Area 1..1
Data Area 1..1
Get 1..1
Engineering Change Order 1..∞
Scenarios in which Get Engineering Change Order is used
Feedback
OAGi and its members welcome your feedback.
UUID: 1100a41e3c9a4a63bce897ebaf0a33e4
OAGIS Version 10.13.2