BOD: Show Engineering Change Order
The purpose of the ShowEngineeringChangeOrder is to communicate to a business application module or system the sending systems representation of a specified Engineering Change Order. This request may be used as a response to a Get request or as a push notification of an event.
This BOD may be necessary to address the Make to Order, Assemble to Order, or Mixed Mode business ordering scenarios in a Order Management to Manufacturing application integration scenario.
There are many possible business applications in several environments that may use this capability. For example, a PDM, MRP, Inventory, or Manufacturing business application could use this to communicate the requirement to synchronize a Engineering Change Document.
Child Components
Release Identifier 1..1
Version Identifier 0..1
System Environment Code 0..1
Language Code 0..1
Application Area 1..1
Data Area 1..1
Show 1..1
Engineering Change Order 1..∞
Scenarios in which Show Engineering Change Order is used
Feedback
OAGi and its members welcome your feedback.
UUID: c365462ed4f04f41a0c4e2d3e78b2719
OAGIS Version 10.13.2